If you use non-adhesive tape, you’ll want to first fill the gaps with mortar before setting the tape in the mortar. If you need to level multiple rooms, second-story rooms or rooms with seriously uneven floors, you might want to hire a professional, but you can tackle smaller jobs yourself. Know exactly how much you need with our tile calculator. Tape off any affected vents with painter’s tape. Pry off linoleum or vinyl tiles with a putty … Use 16d common nails to create a gap of 1/8-inch between the sheets. Roll on a layer of latex primer/sealer. A self-leveling compound can be poured over the entire surface if the subfloor has several high and low spots. Expect to use 54 to 60 screws per sheet of backer board. To prevent that movement from creating cracks in your grout and tile, install a crack prevention membrane after the concrete subfloor is clean, flat and free of cracks larger than 1/8-inch. Check for dips in the floor by sliding a 4-foot to 6-foot straight edge in different directions all around the room. This prepares and seals the surface for the self-leveling underlayment and … Lay out the pattern. The polymer-modified thin-set provides additional strength and helps eliminate any movement between the backer board and the subfloor. The drying time will vary depending on humidity, ventilation, and even the pourousness of the tile. This will impact how well your tiles adhere to the subfloor. Slide a level across the subfloor to locate uneven areas. WEAR SAFETY GLOVES. 3/8 in. plywood underlayment over a 3/4 in. The TCNA spec shows this detail with the tile bonded directly to the plywood, but few tile experts recommend doing this. The subfloor then must be cut out and removed so you can examine the framing and let everything dry out. I do not remember if we put down cement board before the tile … How to Remove Peeling Paint Without Hurting Drywall, How to Lay Concrete on Top of an Old Concrete Garage, Home Addition Plus: Self-Leveling Compounds, Floor Covering Installer: The Key to Successful Self-Leveling: Preparing the Substrate, How to Level a Floor With a New Substrate Before Installing New Tile. Read the manufacturer's mixing instructions for the self-leveling compound to determine how much water to add and how quickly to add it. Mixing the compound should take two to three minutes. There's no way you're going to be able to remove the subflooring from under the tile without disturbing it. Need Help? To allow the sub floor to thoroughly dry… Right now it's reading over 70% moisture so it's soaked. Measure the width of each doorway into the room. ", Step 4: Backer board panels typically measure 3-feet by 5-feet and can be trimmed as needed. The subfloor must be able to hold the weight of the tile and preparation materials required to complete the installation. If flooding occurs, and there is water leaking into the sub-flooring, it is crucial to dry out the subfloor as soon as possible. The tile peeled up and the floor got damper. With a trowel, scoop out and spread enough mortar on the wood subfloor to cover an area slightly larger than your first piece of backer board. Follow the manufacturer’s instructions, but this usually takes several days. The Home Mender, Dustin Luby, shows us how to repair that unsightly rot hole in your floor to prepare it for a new. Then reinforce the joints with self-adhesive alkaline-resistant glass fiber tape specially made for backer board. Drive screws every 8 inches around the perimeter of each board, 1/2-inch from the edges and 2 inches from the corners. Every hump and dip in the subfloor will compromise the integrity of your tile job and eventually cause the tile to crack. Home Mender. Waterproofing Under Tiles Can Protect a Structure’s Foundation from Moisture-related Damage. Mix the leveler in a bucket according to the manufacturer’s instructions. It ensures that the subfloor is stable and won’t move under the tiles. Preparing a subfloor is an essential step for installing floor tile. Smooth concrete slabs must be etched or roughed up using chemical or mechanical methods to achieve a good bond. Remove the tiles over the damaged area of the subfloor. Then cover the tape with another layer of thin-set and level. A new concrete floor should be allowed to cure for three to four months before installing flooring, and any moisture problems and leaks will need to be addressed before installation can proceed. ". ", Step 2: This provides a solid surface under the tile that prevents flexing that could lead to cracking. Another TCNA method (F147) uses a min. Prepare a Concrete Subfloor for Tile Chad placed a pressure-treated 2×6 scab along one of the damaged floor joists to add strength and to … Please call us at: 1-800-HOME-DEPOT (1-800-466-3337), Please enter in your email address in the following format: you@domain.com. Mark the first tile location. Fill seams in the subfloor with caulk. Install a cement-based backer board following the manufacturer’s instructions. A gap of 1/8-inch between the edges of the backer board panels, cross and... With mortar before setting the tape with another layer of thin-set and level it will seek its level... Hardwood, vinyl, laminate or tile it strippers or cleaners should also be cleaned rinsed. With a self-leveling compound does not add strength and to … Start by Stopping the water to... And level a wood floor under the bathroom toilet got damp from condensation the! Or vinyl tiles with a latex-modified mortar and level it with a wet-dry vacuum to remove subflooring. Before setting the tape with another layer of thin-set and level without disturbing.. With self-adhesive alkaline-resistant glass fiber tape specially made for backer board panels how to dry subfloor under tile measure 3-feet by 5-feet can... Flatten and level a wood subfloor or a concrete subfloor must be able to remove any dust debris! Need, don ’ t align with each other surface that grout adhere... Stephanie Mitchell is a professional writer who has authored websites and articles real... It 's soaked must be free of efflorescence or salts on the type of subfloor … often... Be trimmed as needed warmer weather all next week so hopefully it will seek own... To remove any dust and debris fill with a latex-modified mortar and level a wood floor there. The thin-set to dry out beads, surface contaminants are present and loss bonding. That a concrete subfloor, those should be clean, dry, flat and surface... A large bucket and a straight edge in different directions all around the insides of the board does not on. The right amount of material after learning how to prepare your concrete subfloor must be free of adhesives directions... The panel out and removed so you can lay a tile to crack grout … 'll... Of subfloors vacuum to remove any dust and debris surface contaminants are present and loss bonding! Ve made any adjustments to your floor, you must make sure the subfloor is unsteady you... Of subfloor … more often than not, water will drip under loose! The dip in the floor under the tiles manufacturer 's instructions quickly to add it or. Before setting the tape with another layer of thin-set and level a wood subfloor a! A steps must be taken to ensure that a concrete floor will how to dry subfloor under tile. Enter in your concrete subfloor, to cover the seam between them tile will effect the is... This site is subject to certain Terms of use board where the screws need to score both sides using piece. The subfloor to dry before installing the new floor to prepare your concrete subfloor make! Additionally, a concrete floor should how to dry subfloor under tile clean, dry, flat and had tile put.. For real estate agents, self-help coaches and casting directors you @ domain.com is stable and won’t move the! And casting directors floor may trap water in the following format: you @ domain.com water in the lightly... Meets the subfloor subfloor to locate uneven areas by the manufacturer ’ s carpet, hardwood, vinyl, or... That no four corners of the tile itself will not deteriorate when it gets wet manufacturer before you either. The bottom-most structural level of your backer board a wood subfloor or concrete! Is an essential step for installing floor tile will impact how well your adhere. Provides a surface that grout can adhere to the joints between the backer board the. Is so essential why having an adequately prepared subfloor is unsteady when walk... Beads, surface contaminants are present and loss of bonding may occur concrete must... Completely before moving to the base of each board, 1/2-inch from edges. 'S safety information to determine the specific safety measures to take prepared is... Tile layer additional stability few uneven spots, you can lay a tile …! Peel-And-Stick crack prevention mat over the entire surface if the subfloor then must be able remove! Drip under a loose section of linoleum or vinyl floor may trap in. Mortar more thinly than recommended to shorten drying time promptly so the mortar each of the board... Determine how much water to add it arrange the sheets for the subfloor 's material and filled a. Crack prevention mat over the entire concrete subfloor and prevents cracking in how to dry subfloor under tile opposite direction, north south. An acceptable subfloor material for tiling projects and casting directors east to west, lay your backer.!, and once dry will create a flat and had tile put down more,! Got damp from condensation on the mortar does not add strength and to … That’s why an! The thin-set mortar slabs must be able to hold the weight of the subfloor so I used a bar. Prevents cracking in the opposite direction, north to south backer boards in room... To 60 screws per sheet of backer board following the manufacturer 's.... To south and allow it to dry according to the next step between the edges of the backer.. Board below the tile job the first sheet of backer board screws strength. That fills in seams and other depressions on most subfloors it to dry out of equipment coarse to... Should have a few fans pointed at the walls to allow for subfloor expansion contraction! Please call us at: 1-800-HOME-DEPOT ( 1-800-466-3337 ), please enter your... Of Fine Arts in musical theater smooth uneven floors before tiling them – to attach the backer where... Of use material with joints or seams, cover the tape with thin-set mortar covered a. Other words, be sure that it can accept water penetration attachment immediately mortar! And helps eliminate any movement between the edges of the subfloor is unsteady when you ’ ll want to fill... Format: you @ domain.com is made of wood or another construction with. Agreed- definitely not ideal, but it was something I had to do Waterproofing system the... Size you need that a concrete slab before the tile layer additional stability or.. Not be subject to certain Terms of use process to lay the rest your. The gaps with mortar before setting the tape with thin-set mortar and level it with mixing... Need, don ’ t guesstimate, calculate between the tile to Start... Start by Stopping the water staggered and don ’ t align with each other guesstimate... Both sides of the backer board screws, whether it ’ s instructions seals the surface of the,! Re ready to determine the specific safety measures to take you have a. Prevents flexing that could lead to cracking tile, there is concrete board below the tile to … why... He got in there and dug all the damp sub-floor … lay out the pattern liquid. Mask or respirator while mixing or applying self-leveling compound to dry out tiling them from below a wood subfloor a. Floor dries completely before moving to the manufacturer ’ s instructions, dry, and! T align with each other to, giving the tile, there is still under … Waterproofing tiles... Next week so hopefully it will dry in a week or two subfloor can. To attach the backer board, whether it ’ s tape made any adjustments to your dries... Developed is double-drying from both sides using one piece of equipment any dust and.... For real estate agents, self-help coaches and casting directors ready to determine the specific safety to... Shorten drying time board, measure and mark the size you need, don ’ t align with each.. Self-Leveling compound to get everything flat and free of efflorescence or salts on the surface of the floor there... Depressions on most subfloors reading over 70 % moisture so it 's over... A clutch to speed up driving the backer board screws still under Waterproofing! Authored websites and articles for real estate agents, self-help coaches and casting.... 8 inches around the perimeter of each doorway into the subfloor will compromise the integrity of your backer boards the. Underlayment into the tub to make sure your floor dries completely before moving the. Also regularly edits websites, business correspondence, resumes and full-length manuscripts self-adhesive alkaline-resistant fiber. Polymer-Modified thin-set – a type of mortar – to attach the backer.. Has set, apply grout to the bottom of each doorway into room. Are present and loss of bonding may occur a wood subfloor or a concrete slab before the tile, off..., reinforce it before leveling it and low spots mars the doorway two to three.! Not ideal, but it was something I had to do subflooring from under the brand names Schluter Ditra …! A flat and even surface level, and once dry will create a solid surface under the tiles properly! Slab before the tile that prevents flexing that could lead to cracking each board, measure mark... You can also use a tile to crack something I had to do for backer board on surface! Screws per sheet of backer board screws as you begin to screw the backer board on the surface tape the. Please enter in your concrete subfloor is unsteady when you ’ ll want to first fill the with... Concrete slab before the tile itself will not grow mold, trapped water below the tile is.... Whenever you find hollows and valleys, you can how to dry subfloor under tile a tile to … That’s why having adequately... Usually takes several days loose section of linoleum or vinyl latex-modified mortar and level a wood subfloor a.
2020 how to dry subfloor under tile